Minimizing the economic unit cost of dragline-truck-shovel operations at Yatagan-Eskihisar open pit mine, Turkey

In open pit and strip mining operations, a variety of mining equipment combinations may be employed for overburden stripping, primarily dictated by the structure and nature of the mineral deposit. In coal extraction bulk operations, such as those found in Germany, Russia, and Australia, bucket wheel excavator-conveyor combinations are used. In the United States, Russia, Canada, and the United Kingdom, dragline mining is common. In almost all countries, shovel-truck combinations are utilized for stripping of overlying strata.
There is a long history of coal production in Turkey; however, the cost of power generation is high. Therefore, it has become necessary to find a means of decreasing production costs to become more competitive in a global market.
This paper attempts to economically minimize the operating costs of a dragline-shovel-truck system applied at an open pit mine, lowering the lignite production cost and, indirectly, the overall electricity generation unit cost. The Yatagan-Eskihisar open pit coal mine used for this study is a dragline-shovel-truck combination operation. The upper section of the overburden is removed by conventional truck-shovel operations (drilling, blasting, loading, and hauling). The remaining overburden is excavated by dragline. In order to create an economically competitive lignite product, the cost of the stripping operations, which have a major affect on the overall unit cost, must be minimized safely within the technical restrictions of the operation.
In this unit cost minimization study, P&H shovels and CAT 777 trucks with capacities of 15 yd3 and 77 tons, respectively, were used in truck-shovel pre-stripping operations. A 65 yd3 Marion 8050 dragline was used to expose the overburden immediately over the coal seam. Pre-stripping bench heights varied from 8 m to 20 m and dragline bench heights from 20 m and 25 m, with a pit width of 80 m. Evaluations were conducted to minimize the unit cost of field operations. Total overburden extended to a depth of 60 m (35 m to 40 m for pre-stripping).
Prior to conducting the cost minimization analysis, the average stripping cost at the mine was $3.12/m3. This high unit cost was primarily due to the inappropriate pit geometry selection for the available mining equipment. To put things into context, given that 15 million cubic metres of material was moved, this corresponded to a cost of $46.8 million per year. Lowering this value will undoubtedly lower the overall production costs, and indirectly lower the cost of power generation. Since the initial capital cost investment is high for draglines, it is difficult to justify mechanical modifications thereafter, and there is little scope for variation to the operating geometry to minimize cost. This leaves mine geometry as the less feasible variable. The most prominent factor in optimization and minimization analysis is operating time, as it plays an important role in lowering the unit cost to operate equipment more efficiently. In this case, the price of a dragline with such capacity was assumed to be $50 million, a major consideration in terms of the time value of the dollar.
The unit cost minimization study with respect to the dragline operation showed that the dragline was not efficient at a bench height of 20 m, resulting in a somewhat higher cost, making the 25 m bench height the better choice. For drilling, blasting, loading, and hauling unit truck-shovel pre-stripping operations, the unit cost minimization study identified the most economical bench height to be 15 m. Combined with a dragline bench height of 25 m, the outcome identified an economical unit cost at $2.5/m3.
Full Access to Technical Paper
PDF version for $20.00
Search
Sort By:  Relevance
Showing results 1 - 6
Text
Summary: The application of telerobotics to mining is currently being employed in production systems around the world. While mining companies have dominated the pursuit to implement this technology, organizations within other industries have continued to search for ways in which telerobotics could support more productive and efficient operations within their environments. Widespread adoption, however, requires development of the technology to a level well beyond its current state.
A Canadian Research...
Publication: CIM Bulletin
Author(s): G. Baiden
Issue: 1088
Volume: 98
Year: 2005
Text
Summary: In 2001, the Catholic University of Chile undertook a maintenance benchmarking study of six open pit copper mines having mill capacities varying between 18,000 t/d and 156,000 t/d, and collectively responsible for 58% of Chilean copper production. Key performance indices were selected to measure the effectiveness, efficiency, and development of the maintenance process.
Key effectiveness indices used in the mining industry are equipment availability, reliability, and maintainability and safety...
Publication: CIM Bulletin
Author(s): P.F. Knights, P. Oyanader
Issue: 1088
Volume: 98
Year: 2005
Text
Summary: Mining in highly stressed ground conditions has been an increasing challenge at Brunswick mine. After over 30 years of mining, there were two large regional pillars established on the 1000 m Level to support the ground for safe extraction of the surrounding ore. The South Regional Pillar contains about 5 Mt of ore and the North Regional Pillar (NRP) has about 3 Mt of ore.
In the fall of 2000, mining activities were suspended following a series of ground movements around the South Regional...
Publication: CIM Bulletin
Author(s): Q. Liu, B. Ellis, S. Chung
Issue: 1088
Volume: 98
Year: 2005
Text
Summary: A pipeline syphon can be a simple and reliable alternative for water conveyance over earthfill dams, or other topographic features, as compared to otherwise more complex pumping systems or buried pipelines. In its simplest form, a pipeline syphon consists of an airtight pipeline constructed over the top of a dam or other high topographic feature, connecting a source pond to a receiving pond or channel. It typically includes a submerged intake, conveyance pipeline, priming device, flow rate...
Publication: CIM Bulletin
Author(s): K.G. Kress, W.J. Dick
Issue: 1088
Volume: 98
Year: 2005
Text
Summary: In 1998, Atlas Copco released the RCS technology opening the way for a new generation of modularized and computerized drill. Drilling accuracy, information logging, and serviceability have all taken a quantum leap forward when compared with previous generations of drill rigs. The modularity also facilitates almost unlimited possibilities for the expansion and adaptation of drill rig functions.
The Atlas Copco product strategy defines three levels of machine automation: ‘basic’ with manual...
Publication: CIM Bulletin
Author(s): M. Ramström
Issue: 1088
Volume: 98
Year: 2005
Text
Summary: Controlling the level of impurities in copper refinery electrolytes is essential to achieving acceptable cathode purity. Purge of electrolyte to waste is not an entirely satisfactory remedy, since the cost of neutralization, hazardous solid waste disposal, and replacement acid can be appreciable. Recovery by evaporation/crystallization is also not ideal because of high capital, operating, and maintenance costs.
Based on a phenomenon called acid retardation, the APU® process employs ion...
Publication: CIM Bulletin
Author(s): C.J. Brown
Issue: 1088
Volume: 98
Year: 2005