Telkwa Coal Project

CIM Bulletin, Vol. 90, No. 1015, 1997
A. Flemming, Manalta Coal Ltd, Calgary, Alberta
As the next century draws near, new mine properties must be brought into production to replace existing operations that are approaching their economic life. This paper presents some of the critical technical issues being addressed by Manalta Coal Ltd. as they strive to bring the Telkwa Coal Project near Smithers, BC into production during the year 2000. The mine is planned to produce between 1.0 to 1.5 million tonnes per year of medium volatile coal for export to overseas thermal and PCI markets.