A mine operator's implementation of geostatistics

Abstract At most operating mines, geostatistical ore reserve estimation methods have been implemented by head office or consulting groups. With recent advances in small computer technology it is now possible for a remotely-located mine department to independently implement a geostatistical package.
This paper describes the evolution of geostatistical routines to calculate the mineral inventory for porphyry type copper/ molybdenum or similar ore bodies. The problems encountered in down sizing the geostatistical routines to run using limited minesite computing facilities are discussed. The high quality of the results, in spite of some compromises to geostatistical theory, is emphasized.
The first stage entailed the development of a mineral inventory based on diamond drill data. The difficulties in fitting variogram models to two metals, copper and molybdenum, and the shortcomings of the mineral inventory due to the mixing of lesser quality exploration data with data from more recent diamond drilling are discussed.
To improve the ore reserve estimates for short-term planning, a mineral inventory was produced using both the diamond drill and production blast hole drilling data. This inventory, when compared to actual grades, was found to be quite satisfactory for short-term planning. The inventory also provided a reliable data base for long range pit design and financial planning. By regularly updating the mineral inventory, many of the uncertainties of mining a low-grade orebody were minimized.
Keywords: Mine planning, Geostatistics, Ore reserves, Mineral inventory, Kriging, Grade control.
Full Access to Technical Paper
PDF version for $20.00
Search
Sort By:  Relevance
Showing results 1 - 5
Text
Summary: No Canadian or his family is likely to escape the effects of proposals for pension reform tabled on October 9, 1986 by Finance Minster Michael Wilson. New tax rules are proposed for Registered Retirement Savings Plans (RRSPs), company pensions, and other forms of retirement plans. Draft legislation is expected to be released in the first half of 1987.
Publication: CIM Bulletin
Author(s): ROBERT B. PARSONS
Issue: 899
Volume: 80
Year: 1987
Text
Summary: Two analysis tools which have been applied to problems in industrial flotation processes are the application of kinetics and detailed mineralogical or liberation data, both on a size-by-size basis. This paper describes practical examples of the application of kinetics to examination of the entrainment recovery mechanism, the retardation of valuable minerals at the commencement of flotation sections and the resolution of problems related to valuable species with reduced rate constants at the...
Publication: CIM Bulletin
Author(s): N.W. JOHNSON
Keywords: Kinetics, Liberation, Flotation process, Mineralogy, Sphalerite, Sulphide gangue minerals.
Issue: 899
Volume: 80
Year: 1987
Text
Summary: Aspects of materials, design and operation of suspension equipment is dealt with, hazard, fatigue and special metallurgical properties of certain steels to resist are described, as is the effect of temperature in service modifying the properties of some steels to resist stress concentration and propagation of cracks.
The influence of steady impact and fatigue loading and its results are described. Control of manufacture including nondestructive testing is outlined and acceptance parameters...
Publication: CIM Bulletin
Author(s): E.A. DAVIES, T.T. JONES
Keywords: Equipment, Maintenance, Suspension gears, Fatigue loading, Mechanical strength, Non-destructive testing, Quality control, Heat treatment.
Issue: 899
Volume: 80
Year: 1987
Text
Summary: Those who submit competing proposals for projects seek to present senior management with complete and fully supported material that will not fail under questioning. Hopefully, misleading notions and omissions will have been minimized and there will have been testing of the assumptions regarding the economic, social and political environments.
A capital project evaluation team can do management and itself a service by including a sound approach to the impact of inflation (and its twin problem,...
Publication: CIM Bulletin
Author(s): L.D. SMITH
Keywords: Economics, Inflation, Production.
Issue: 899
Volume: 80
Year: 1987
Text
Summary: The new H-W orebody was evaluated by considering its production at three technically feasible rates. Capital and operating costs were estimated for each rate and production sequences were established using mining cutoff limits generated by an ore value algorithm. The viability of the project was then examined by conducting economic and financial analyses of each of the three production cases under various world economic scenarios. These analyses employing standard profitability measures...
Publication: CIM Bulletin
Author(s): BRUCE K. McKNIGHT
Keywords: Economics, Orebody, Capital costs, Algorithm, Financial analyses.
Issue: 899
Volume: 80
Year: 1987
Powered by Coveo Enterprise Search