No. 2 Shaft Raise, Aunor Gold Mines, Ltd.

CIM Bulletin1957
THE PROPERTY of Aunor Gold Mines, Limited, consists of eleven claims, located in Deloro township, approximately three miles southeast of the town of Timmins. Production began in 1940 and currently the mine is operating at a rate of 485 tons per day.
Keywords: chlorite, drives, footwall, schist, talc, Drifts, Drilling, Limited, Mine, Mines, Operation, Raises, Raising, Shafts
Full Access to Technical Paper
PDF version for $20.00
Other papers in CIM Bulletin1957