Best Practices - Tailings Dam Design

CIM Montreal 2015
Harvey N. McLeod (Klohn Crippen Berger Ltd. ), Bryan D. Watts (Klohn Crippen Berger Ltd. ), Howard Plewes (Klohn Crippen Berger Ltd. )
Modern tailing dam designs evolved with and from the developing state of practice for water dams, since the mid 1960’s and continue to evolve today. Tailing dams are a unique variation of water dams and, while the geotechnical principles used for water dams apply equally to tailing dams, there are distinct differences in design of the dam section. Implementation of good design practice starts with understanding the site conditions, properties of the tailings, and geotechnical properties of dam materials. The selection of the dam design section must, in addition to satisfying dam safety criteria, include design consideration of the tailings and closure. Examples of poor practice in selection of a tailing dam design section are provided to illustrate some of the common, and uncommon, design flaws in dams that have recently been constructed or designed. Tailing dams are typically raised over a long period of time, which provides an opportunity to incorporate knowledge gained from the observational approach. The final objective of the tailings dam design is to allow a safe sustainable closure condition. The knowledge to design, construct, and close, safe sustainable tailing dams is available however there is a failure within the engineering, education, regulatory and industry bodies to consistently implement good tailing dam design practices.
Keywords: Design Sections, Practice Implementation, Tailing Dams, Site Conditions
Full Access to Technical Paper
PDF version for $20.00
Other papers from CIM Montreal 2015