Traditional planning methods such as CPM and PERT have been useful tools to manage construction projects. However, the underlying model of these traditional methods often seems to fail to represent real projects as they tend to assume no interrelationship between project components. In reality, project components have complex dynamic feedback process that requires modeling of inherent uncertainty in the execution of these projects. Nevertheless, this dynamic nature and uncertainty have not been explicitly addressed by traditional planning methods. Project failure can be attributed to poor representation of the inner and outer aspects of operations that are responsible for project dynamics. Uncontrollable external forces are often cited but the real cause may be internal such as the feedback process among components of the project. An alternative perspective is offered in this paper through system dynamics (SD) that accounts for the feedback process and discrete event simulation (DES) for modeling the uncertainty. The proposed method utilizes SD method for modeling project dynamics and DES method coupled with CPM network for operational details and uncertainty, respectively. A case study that involves preparing engineering drawings in a design office is used to demonstrate the use of the developed method and to highlight its capabilities. Modeling the dynamic dimension is expected to enhance planning and scheduling of construction operations and to provide a better understanding of the impact of various internal and external factors on project schedule and productivity performance.
Keywords: Projects; Models; Model; Planning; Simulation; Simulations; Simulation; Systems; Construction; Productivity;
Full Access to Technical Paper
PDF version for $20.00
Other papers from ISARC
Search
Sort By:  Relevance
Showing results 1 - 50 of 187
Text
Summary: Project context, goal & objectives Project review Application overview Key lessons learned Questions
Proceedings: ISARC
Author(s): Vincent Roy;     
Keywords: Projects; Model; Models; Dams; Foundations; Systems; Applications; Modeling; Data; Drills;
Year: 2013
Text
Summary: • Need and Introduction • Interface Management Programs – Outcomes of Successful Interface Management – Key Success Factors • Lessons Learned • Concluding Remarks
Proceedings: ISARC
Author(s): R. Simonson; K. Maloney; C. Haas; S. Shokri;
Keywords: Projects; Management; Information; Communication; Communications; Risk; Risks; Data; Planning; Systems;
Year: 2013
Text
Summary: • Automated Spot Generation • No Operators below the Highwall • No Operator Wear and Tear • Reduced Swing Time • Single and Double Sided Loading • Minimized Bench Width
Proceedings: ISARC
Author(s): Joe Shoemaker;     
Keywords: Benefits; Performance; Safety; Loading; Operators; Hauling; Mine; Mines; Grade;
Year: 2013
Text
Summary: WMS is a the new SNC-Lavalin solution to complete and support your site’s operation. It targets phases in the project cycle including mechanical completion, pre operational verification and commissioning. The goal is to track phases completion and electronically deliver a plan with hand over documents.
Proceedings: ISARC
Keywords: Projects; Follow-up; Phase; Cycles; Processes; Process; service; Services; Operation; Support;
Year: 2013
Text
Summary: • Employ more than 14,000 around the world, includes: – Over 8,600 in Canada (close to 7,800 in British Columbia) – Close to 2,000 in Chile – Over 2,700 in Peru – Approximately 600 in U.S. – Hundreds more in exploration around the world • Total capital expenditures – $1.8 billion for 2012
Proceedings: ISARC
Author(s): Peter Cunningham;     
Keywords: Mine; Mines; Systems; Production; Cost; Costs; Computers; Computer; Operators;
Year: 2013
Text
Summary: • Accurassay Laboratories and Automation – History and experience – Features and benefits of automation in the lab • Tata Steel Minerals Canada (TSMC) Iron Ore Laboratory – State-of-the art systems and design – The integration of fusion systems and XRF units – Meeting deliverables: quality, reliability, safety
Proceedings: ISARC
Author(s): Brad McBain;     
Keywords: Automation; Systems; iron ore; Iron ores; iron ore; Benefits; Phase; quality; Costs;
Year: 2013
Text
Summary: What is Situation Awareness (SA)? – Background on SA theory • SA is critical in a wide variety of domains – SA and human performance – Consequences of poor SA • Significant challenges for SA in mining operations – Technology centric design • SA-oriented design methodology – Goal-Directed Task Analysis – Design – SA Measurement and Evaluation • Applications of SA-oriented design
Proceedings: ISARC
Author(s): Emrah Onal;     
Keywords: Design; Operators; Performance; Methodology; Cost; Costs; Safety; Challenges; Mining operations;
Year: 2013
Text
Summary: • KHNP is participating in the construction of Nuclear Power Plant both in Korea and UAE. • We want to improve our construction project management process. • So we are now developing the process model on nuclear power plant construction management. • For the effective adoption of this process, we are planning to develop IT system. • For the first step, we were established the Information Strategy Plan
Proceedings: ISARC
Author(s): Hye Jin Son;     
Keywords: analysis; Processes; Process; Nuclear power; Construction; Systems; Plants; Planning; Information;
Year: 2013
Text
Summary: • Increase Government Regulation • Safety practices evolve from: – Increased efficiency and performance – More knowledgeable workforce • Focus on decreasing risk to shareholder value In Order to achieve this • Focus Points: – Skill Development – Best practices – Situation-based decision making • Enablers: – Adoption of new technologies – Transformed miner education – Delivering on-demand information to the point of work Results: Miners empowered to improve mine safety
Proceedings: ISARC
Keywords: Safety; Risks; Risk; Information; Management; Operation; Mines; Mine; Systems;
Year: 2013
Text
Summary: This paper presents quantitative indexes to evaluate operator’s bearing, difficulty in a task, and machine operability when an operator remotely controls a backhoe, and reports the use cases. The quantitative indexes would give her/him the opportunity to reflect on her/his works, and enable us to gain in-depth insight into the teleoperation, and furthermore give us with promising hints to improve it.
Proceedings: ISARC
Author(s): Shigeomi Nishigaki; Katsutoshi Saibara; Shigeo Kitahara; Kenichi Fujino;
Keywords: Operators; experiment; Experiments; Operation; Bearings; trial; Control; Controls; Control; teleoperation;
Year: 2013
Text
Summary: The networks of interdependencies between elements in building projects, referred to as the project topology, are often complex and difficult for project teams to comprehend. It is hypothesized that a graphbased model of the project topology can be based on existing data in Building Information Models (BIM), facilitating the application of graph-theoretic algorithms to analyze this topology. The objective of this study is to propose an outline for the synthesis of BIM and graph theory. This...
Proceedings: ISARC
Keywords: Projects; Models; Model; Design; Information; Requirements; Construction; Algorithms; Algorithm;
Year: 2013
Text
Summary: The report focuses on the process measurements of the mass of rock in the bucket power shovels and dragline excavators. The mathematical models are suggested of AC and DC electric drives of excavators. These models are a basis for calculation methods of the electric drive electromagnetic torque. The design schemes of mechanical equipment of excavators considered to account the situation of bucket in the plane of the boom. The methods of static moment allocation and identification of the...
Proceedings: ISARC
Author(s): A.L. Karyakin; P.A. Osipov;
Keywords: excavator; Excavators; Coordinate system; Electric drives; Information; Shovels; shovel; Motors; Operation; Power;
Year: 2013
Text
Summary: This paper presents the results of field test and theoretical analysis driving resistance articulated 4x4 tracked robot test-bed. Tests were made on four different grounds. Designated elastomeric tracks resistance coefficients are much higher than for steel tracks. This information was important for the proper estimation of energy consumption in the process of driving.
Proceedings: ISARC
Author(s): M.J. Łopatka; T. Muszyński;
Keywords: Resistance; Capacity; Value; Systems; Tests; test; Vehicles; Pressure; Concrete; Drive systems;
Year: 2013
Text
Summary: Hong Kong has a dense distribution of utility services laid under its road network. Utility undertakers frequently demand road openings to install new services and/or maintain existing ones. Road openings can cause troubles to the road network and negatively impact the public interest. Highways Department is responsible for managing road openings in Hong Kong under the Land (Miscellaneous Provisions) Ordinance. Highways Department has spent a lot of efforts to computerize excavation permit...
Proceedings: ISARC
Author(s): Xiang Yu; Xueqin Zhang; Yashuai Li;
Keywords: Permits; excavation; Management; Processing; Applications; Traffic; Systems; Government; Governments; Inspection;
Year: 2013
Text
Summary: Mining operators are faced with complex information delivered by technology-centric rather than user-centric systems. The ability to achieve high situation awareness (SA) in the face of this data overload is a key challenge for effective decision making and information exploitation. Incidents that result in loss of revenue and even life, and compromise safety that are attributed to human error are often the result of system designs that overload human cognitive capabilities. This paper...
Proceedings: ISARC
Author(s): E. Onal; C. Craddock; M.R. Endsley;
Keywords: Operators; shovel; Shovels; Design; Information; Systems; analysis; Requirements;
Year: 2013
Text
Summary: As the construction industry is becoming more large-scaled and complex, the BIM technology has been utilized throughout the industry. Since 2008, the construction industry in South Korea (Korea) has required carrying on BIM-based project continually. According to this trend, BIM S/W market, as well as BIM library market is also gradually activated. Many countries have already been establishing Web-based BIM library market, also Korea has been trying to establishing this Web-based BIM library...
Proceedings: ISARC
Author(s): Dong-min Lee; Chan-ho Park; Jae-sang Ahn; You-na Cha; Sang-yoon Chin;
Keywords: Markets; Systems; Construction; Applications; Technology; Distribution; Design; Processes; Process;
Year: 2013
Text
Summary: A working code is developed to simulate the forces that are involved in the process of penetration of a bucket into bulk media during loading and excavation. The result of this work can be integrated with the simulation software that many manufacturers of heavy earthmoving machines introduce for training purposes. The simulator programs for machines such as backhoes, loaders, LHDs and the like, used for operator training, are usually only based on the kinematics of the machine. As a result,...
Proceedings: ISARC
Author(s): Ahmad Hemami;     
Keywords: excavation; Simulation; Simulations; Materials; Resistance; excavator; Excavators; Loading; Value;
Year: 2013
Text
Summary: The scope of the SA (Situational Awareness) working group is to analyze the effectiveness of information delivery systems in mining equipment and develop a unified display design, to mitigate against the proliferation of screens within equipment cabs. This working group comprises a variety of stakeholders representing a cross-section of relevant mining and mining-related organizations. This stakeholder network will help guide the direction of the working group towards a common, mutually...
Proceedings: ISARC
Author(s): Andrew Chapman;     
Keywords: Design; Screens; Equipment; Mining shovels; Barrick Gold Corporation; Effectiveness; Information; Systems; Mining equipment;
Year: 2013
Text
Summary: We discuss the stability problem of a piston of the reversible axial-piston pneumatic motor called DAR-14M. We performed the full analysis of stress and deformation characteristics of the piston near a resonant frequency with the help of FEM ANSYS. We estimated the own frequency of the piston analytically for the given motor, this estimate was confirmed numerically in the model analysis FEM ANSYS. It was also shown in harmonic analysis that loaded piston end behaves very different in...
Proceedings: ISARC
Author(s): L.T. Raevskaia;     
Keywords: stress; Frequency; Deformations; deformation; Bearings; Motors; Shafts; analysis; Systems;
Year: 2013
Text
Summary: The increase in the number of higher and larger buildings is expected to require the buildings' outer wall maintenance process, which includes cleaning, painting and monitoring, still depends on manpower. In this study, we proposed the robotic building maintenance system and aimed to reduce the jerk effect through the motion control of the system, improve the performance of the maintenance task, and ensure longer life and safety by improving the stability of the building structure and robot...
Proceedings: ISARC
Author(s): Seunghoon Lee; Dong-Hyung Kim; Sungpil Kang; Chang-Soo Han; Min-Sung Kang; Myeongsu Gil;
Keywords: Systems; Control; Controls; Sensors; Maintenance; Stability; Manpower; Modules;
Year: 2013
Text
Summary: Excavation and earthmoving equipment mostly operate in accident-prone areas. These areas normally have rollover, confinement, and fall or may be considered harmful work areas due to demolitions and sewage removals. It is inevitable that excavation and earthmoving systems should be developed to secure the safety of operators through unmanned and remote control systems. Therefore, this research proposes a system that enables excavators to be unmanned and remote controlled without any renovation...
Proceedings: ISARC
Author(s): Min-Sung Kang; Myeongsu Gil; Seunghoon Lee; Dongsu Shin; Chang-Soo Han; Jung Soo Han;
Keywords: excavator; Excavators; Systems; Sensors; Modules; Research; Construction; excavation; Information; Operators;
Year: 2013
Text
Summary: The purpose of this paper is to propose the real-time facility management system framework based on Building Information Model (BIM) and Web of Things. Latest IT such as BIM is rapidly spreading to architecture, civil engineering, engineering and maintenance with the aim of simplifying complex system in buildings and facilities, minimizing operation cost, providing high value services and advancing facility management. In particular, BIM-based management framework design to assist the...
Proceedings: ISARC
Author(s): Seongki Lee; Sung-Ah Kim; Eun-Ho Oh; Eun-Young Shin; Tai-Kyung Kang; Yoo-Sub Lee;
Keywords: Information; Sensors; Technology; Services; service; Systems; Web services; Management; Data; Management systems;
Year: 2013
Text
Summary: Currently, a new construction method using a robotic system is widely spreading in construction sites. This study is related to the design of glazing robot’s teach pendant which can improve convenience of handling and hence improve the productivity through the efficient interaction between an operator and a robot while doing glazing works, e.g., curtain wall installing. The suitability of selection and arrangement of control switches was assessed according to mechanical motions of a glazing...
Proceedings: ISARC
Author(s): Seungyeol Lee; Sunghoon Eom; Jeonil Moon;
Keywords: Control; Controls; Control; Construction; Productivity; Design; Correlation; Guidelines; Mechanical;
Year: 2013
Text
Summary: Recirculation is the major concern associated with the utilization of booster fans. In controlled recirculation, a portion of the return air is purposely mixed with the intake air and the mixture is directed towards a working district, while the air quantity and gas concentrations in the air are closely monitored and managed. The objectives of this study were to determine the gas concentration in intake and return airways during controlled recirculation, and to determine the recirculation...
Proceedings: ISARC
Author(s): V. Gangrade; F. Calizaya; M.G. Nelson;
Keywords: Fans; Air; Intake; CO2; Systems; Models; Model; Pressure; Controlled recirculation; Gas concentrations;
Year: 2013
Text
Summary: To achieve renovation work without noise, the authors developed techniques of manufacturing pre-cut interior finishing components for renovation work. In this paper, to achieve the system of pre-cut interior finishing components, the authors describe a measuring method of reinforced-concrete structure by 3D laser scanner and then describe a method of making a design of pre-cut interior finishing components with the polygon model. Using these two methods, the steps of manufacturing pre-cut...
Proceedings: ISARC
Author(s): Kosei Ishida; Naruo Kano; Takeshi Igarashi; Hirohiko Fujii; Yuji Oosawa; Shintaro Sakamoto;
Keywords: Models; Model; Design; Data; Materials; Structure; Manufacturing; Production; Concrete;
Year: 2013
Text
Summary: A monolithic caisson is one of the major structural components commonly used in the construction of docks, breakwaters, and container terminal quay walls. Since the structure of monolithic caissons is typical and somewhat simple, its design process is also typical and repetitive, but still time consuming. To reduce the total time and enhance productivity, we developed a parametric model in Revit to automatically generate a 3D model of a monolithic caisson. It is designed to generate the Revit...
Proceedings: ISARC
Keywords: Modeling; Model; Models; Design; Projects; Structure; Construction; Processes; Process;
Year: 2013
Text
Summary: It always has been a serious issue to improve safety in mine sites, demolition work sites, and civil engineering work sites. Especially, collision accidents caused by construction equipment damage not only the productivity of operations but also the health and life of workers in those work sites. To solve this problem, a variety of worker auto-detection means are developed so far, but they have not still become widely used in actual worksites. There have been two controversial points in the...
Proceedings: ISARC
Author(s): H. Ishimoto; T. Tsubouchi;
Keywords: Excavators; excavator; Systems; Equipment; vision; Accidents; Construction; Operators; Safety; Hydraulic excavators;
Year: 2013
Text
Summary: The increasing size and complexity of mega construction projects result in having several geographically distributed stakeholders, collaborating with each other to successfully deliver the project. Electronic Product and Process Management Systems (EPPMS) are recently emerging to facilitate the collaboration between stakeholders, reduce the surprises and issues, and improve the project productivity. These are commercially successful but evolving systems. An important component of EPPMS is the...
Proceedings: ISARC
Author(s): S. Shokri; C.T. Haas; R.C.G. Haas; K. Maloney; S. MacGillivray;
Keywords: Projects; Construction; Management; Communications; Communication; Management systems; Processes; Process; Systems; STEPS;
Year: 2013
Text
Summary: Network communication note is a cloud system for an earthwork project. It enables backhoe operators and dump truck drivers to monitor their own works in progress currently and performed up to the present, and to have opportunity to reflect on their own bearings in the earthwork operations, and then could increase their situational awareness to the actual work conditions. First, this paper presents problems and purpose. Secondly, the configuration of the network communication note is reported....
Proceedings: ISARC
Keywords: Operators; Communication; Communications; Trucks; Truck; Construction; Operation; Bearings; Management systems; Processes;
Year: 2013
Text
Summary: Rock-breaker automation and remote operation improves the safety and efficiency of mining operations. This article presents an overview of the Rocklogic rock-breaker automation system architecture that provides collision avoidance, automated parking, and remote operation functionality. The system consists of a distributed computer control system that interfaces with sensors attached to the rock-breaker, the rock-breaker hydraulics, and the site infrastructure. We present results of an...
Proceedings: ISARC
Author(s): A. Boeing;     
Keywords: Systems; Operation; Operators; Controls; Control; Automation; Production; Vehicles; Cycles;
Year: 2013
Text
Summary: Tele-operation manipulators applied in this paper are systems for the remote handling and management of pyroprocessing related facilities in an Argon cell of the KAERI (Korea Atomic Energy Research Institute). Generally, these kinds of systems are composed of a master-slave system and its peripherals installed along the wall of the cell, with the master transmitting the user’s own motion to the gripper directly. This study introduced various considerations and modifications to improve the...
Proceedings: ISARC
Author(s): S.N. Yu; J.K. Lee; S.H. Kim; B.S. Park; K.H. Kim; I.J. Cho;
Keywords: Systems; Modules; Equipment; Performance; Operators; Tele-operation; Tests; test; Operation; Load;
Year: 2013
Text
Summary: For ageing open pit mining operations where the economic viability of another pushback is questionable, mine life can be extended by increasing the wall slope. If the steepening is started where ore intersects the pit wall, the capital outlay for waste stripping is minimal. Such a venture must be conducted safely, and a basic requirement would include loading equipment capable of working remotely. In the application described, alternatives in the choice of loader included equipment available...
Proceedings: ISARC
Author(s): Garston H. Blackwell;     
Keywords: shovel; Shovels; Truck; Trucks; Operation; Pits; Operators; Cables; mining;
Year: 2013
Text
Summary: Today road construction sites utilize more and more information modeling in design phases as well as model based 3-D machine control systems in site operations. For main contractor, the management and control of all the site operations is a demanding task including also many challenges created by continuously developing new technology. In the paper, the main requirements for successful dynamic site management are introduced. The dynamic management means real-time possibilities for information...
Proceedings: ISARC
Author(s): R. Heikkilä; P. Tiitinen;
Keywords: Construction; Management; Systems; Automation; Projects; Information; Control Systems; control system; Control Systems; Control;
Year: 2013
Text
Summary: Pavement condition assessment is an indispensable constituent in maintaining roadway infrastructure. Current practices for pavement condition assessment are labor intensive which introduce subjectivity in pavement rating and are time consuming. Automated methods rely on full 3D reconstruction of the pavement surface which introduces high equipment and computation costs. This paper presents a methodology for detection of patch type distresses in asphalt pavement images. This method uses...
Proceedings: ISARC
Author(s): S.C. Radopoulou; G.M. Jog; I. Brilakis;
Keywords: Data; Processes; Process; Algorithm; Algorithms; Transportation; Engineering; Research; Asphalt; identification;
Year: 2013
Text
Summary: Construction equipment is an important type of resources of heavy construction contractors. Since equipment breakdowns can cause project delays and significant financial losses, the contractors are eager to know those factors causing equipment failures directly or indirectly, related to equipment design, maintenance, and operations. Although Bayesian network can be used for diagnostic analysis of failure events or making predictive analysis, building a Bayesian network for such purpose can be...
Proceedings: ISARC
Author(s): H.Q. Fan;     
Keywords: Failure; failures; Equipment; Data; Construction; Structure; Probability; analysis;
Year: 2013
Text
Summary: Over the past decade the use of BIM in the AEC industry has grown several fold and with it the number of standards available for implementing BIM. The ‘National BIM Standard’ by buildSmart Alliance, the ‘Contractor Guide to BIM’ by the Associated General Contractors of America, the ‘BIM Project Execution Planning Guide and Templates’ from Penn State University, the ‘BIM Roadmap’ by the US Army Corps of Engineers are some of the several BIM guidelines that are currently available to the AEC...
Proceedings: ISARC
Keywords: Processes; Process; Projects; Design; Contractors; Models; Model; Construction; Guidelines;
Year: 2013
Text
Summary: Over the past decade the use of BIM in the AEC industry has grown several fold and with it the number of standards available for implementing BIM. The ‘National BIM Standard’ by buildSmart Alliance, the ‘Contractor Guide to BIM’ by the Associated General Contractors of America, the ‘BIM Project Execution Planning Guide and Templates’ from Penn State University, the ‘BIM Roadmap’ by the US Army Corps of Engineers are some of the several BIM guidelines that are currently available to the AEC...
Proceedings: ISARC
Keywords: Processes; Process; Projects; Design; Contractors; Models; Model; Construction; Guidelines;
Year: 2013
Text
Summary: This study presents a framework for quality inspection of precast concrete components using the 3D laser scanning technique. As precast concrete-based rapid bridge construction is getting standardized, quality assessment of the precast concrete becomes critical for preventing any failures during the construction process. Moreover, as Building Information Modeling (BIM) gains popularity in the construction industry, autonomous and intelligent inspection systems are needed. Current method for...
Proceedings: ISARC
Author(s): M.K. Kim; H. Sohn; D. Wu; J.C.P. Cheng; C.C. Chang;
Keywords: Inspection; Damage; quality; precast concrete; Data; Construction; Information; Concrete; Systems; Storage;
Year: 2013
Text
Summary: This paper presents a BIM-based Risk Identification Expert System (B-RIES) for metro construction, composed of three main built-in subsystems: BIM extraction, knowledge base management, and risk identification subsystems. The engineering parameter information related to risk factors is extracted from the BIM of a specific project where the IFC standard plays a bridge role between the BIM data and metro construction safety risks. An integrated knowledge base, consisting of fact base, rule base...
Proceedings: ISARC
Author(s): Limao Zhang; Xianguo Wu; Lieyun Ding; Yueqing Chen; Miroslaw J. Skibniewski;
Keywords: Risks; Risk; Construction; Safety; identification; Information; Engineering; Projects; Systems; Process;
Year: 2013
Text
Summary: With more and more industrial construction projects implementing RFID and other sensor-based technologies on fabrication and project sites, new innovative processes are needed to help automatically read and re-position RFID tags while reducing the cost to deploy RFID infrastructure over large areas. RFID tags are being used on construction sites to help identify the location of materials, equipment and personnel to aid in finding project critical materials and equipment required to construct...
Proceedings: ISARC
Author(s): M. Soleimanifar; D. Beard; P. Sissons; M. Lu; M. Carnduff;
Keywords: Materials; Construction; Projects; Process; Processes; Tracking; Modules; Equipment; Systems; Data;
Year: 2013
Text
Summary: By virtue of its complex nature, the construction industry comprises a wide spectrum of interrelated variables and factors. This multifaceted character of the construction industry puts the use of engineering modeling tools and techniques on top of project management necessities. This research introduces a macro-level earthmoving management system using Genetic Algorithms (GAs) to reach the optimum allocation of earthmoving equipment. The Earthmoving Equipment Management System (EEMS)...
Proceedings: ISARC
Keywords: Equipment; Projects; Models; Model; Operation; Cost; Costs; optimization; Construction;
Year: 2013
Text
Summary: Deformation is a critical indicator required to evaluate the structural safety, stability, and integrity. For example, the deformed shape of a building structure is a key parameter that needs to be measured and tracked during laboratory testing or post-disaster inspections. However, existing techniques used for the deformation measurement and tracking do not have all the desirable characteristics, such as: reliability, accuracy, low-cost and simplicity of tools installation. In order to...
Proceedings: ISARC
Author(s): Z. Zhu; L. Tirca;
Keywords: deformation; Deformations; Structure; Tracking; Frames; Sensors; identification; monitoring; Effectiveness;
Year: 2013
Text
Summary: Technological advances in mobile systems, such as smartphones and tablet computers, provide engineers with new opportunities to enhance the current facility management processes. Equipped with powerful system processors, touch screens, and wireless communication capabilities, mobile systems enable the experience of omnipresence of facility information. Building information modeling (BIM) also enables improvements in facility management. With an advanced data structure and visualization...
Proceedings: ISARC
Author(s): Changyoon Kim; Hynsu Lim; Hongjo Kim; Hyoungkwan Kim;
Keywords: Management; Systems; Data; Model; Models; Information; Maintenance; Processes; Process;
Year: 2013
Text
Summary: As of November 2012, the Alberta government listed 53 oil and gas, oil sands, and mining construction projects either proposed or currently under construction. These industrial plant construction projects have an estimated value greater than 105 million dollars. A common construction method employed for industrial plant projects is fast-track construction, which is used to reduce construction time. Contractors begin fast-track construction with highly generic scheduling information. This high...
Proceedings: ISARC
Author(s): B. Leonard; H. Taghaddos;
Keywords: Projects; Construction; Models; Model; industrial; Information; Systems; Plants; Modeling; Scheduling;
Year: 2013
Text
Summary: Unmanned Aerial Vehicles (UAV) as a data acquisition platform and as a measurement instrument have become attractive for many surveying applications in civil engineering. However, their performance is not well understood for these particular applications. The specific scope of the presented work is the performance evaluation of a UAV system that was built to rapidly acquire mobile 3D mapping data for large earthmoving construction sites. Details to the components of the developed system...
Proceedings: ISARC
Author(s): Sebastian Siebert; Jochen Teizer;
Keywords: Surveying; Applications; Models; Model; Systems; Data; Tests; test; GPS; Performance;
Year: 2013
Text
Summary: It is necessary to assess the physical and functional conditions of highway bridges at regular intervals to ensure they still meet their service requirements. Currently, this condition assessment is mainly performed through visual inspection, which has been identified with several limitations (e.g. the timeconsuming assessment process and heavy reliance on inspectors’ personal experience). In order to overcome these limitations and enhance the current inspection practice, this paper presents...
Proceedings: ISARC
Author(s): R.S. Adhikari; Z. Zhu; O. Moselhi; A. Bagchi;
Keywords: Information; Inspection; Sensing; Retrieval; Engineering; Canada; Process; Processes; Modules; Montreal;
Year: 2013
Text
Summary: Information integration and exchange for the entire building life cycle is one of the most important issues in the AEC industry. Although the Building Information Model (BIM) technology is widely utilized to address them, BIM is mainly concerned within the design and construction (D&C) phases. In the operation and maintenance (O&M) phases, however, the information integration and exchange issue becomes more complicated because software applications here require not only BIM but other...
Proceedings: ISARC
Author(s): Cheng-Ting Chiang; Chia-Ying Lin; Chien-Cheng Chou;
Keywords: Model; Models; Information; Phase; Applications; Data; Management; Processes; Process; Maintenance;
Year: 2013
Text
Summary: The utilization of Building Information Modeling (BIM) and model based 3-D control of work machines have increased a lot in new road construction in Finland as well as in other Nordic Countries. Up today, much less attention has been paid into the development of maintenance and rehabilitation processes. As a part of a large research and development program RYM PRE Infra FIN BIM in Finland, a focused research project of the BIM with experiments in total five (5) pilot projects has been...
Proceedings: ISARC
Author(s): R. Heikkilä; M. Marttinen;
Keywords: Models; Model; 3-D; Controls; Control; Maintenance; optimization;
Year: 2013
Text
Summary: A large research and development program called RYM PRE (Process Re-Engineering) has been active in Finland since 2010. As a part of the program, a work packet Infra FINBIM is focused on the development of new national process model, specifications and requirements for the whole Finnish Infra Industry. In the Infra FINBIM, total 15 companies and main owners and 3 research organisations are included. The work is further continuing. The main achieved results up today have been the first...
Proceedings: ISARC
Author(s): R. Heikkilä; K. Laatunen;
Keywords: Processes; Process; Model; Models; Construction; Information; Development; Developments; Automation; Research;
Year: 2013
Text
Summary: As a part of a large research and development program in Finland, a system calibration for an UAV measurement method having practical experiments in a Jorvas Railway Yard design and construction project. The Railway yard construction are was measured using an UAV measurement device by Smartplanes (Smartone) and using some reference points measured by a GNSS device. The measured data was cleaned, combined and adjusted through Least Squares Optimization using the software developed by a Finnish...
Proceedings: ISARC
Author(s): R. Heikkilä; J. Heikkilä; M. Mikkonen;
Year: 2013