MODELING AND PRICING OF FLEXIBILITY IN CONSTRUCTION OF BLOCK CAVING

World Mining Congress
Building block cave operations involves significant commitments to capital and time before arriving at completion or full scale production. The focus of the mine planners is habitually to minimize the upfront capital and achieve target development rates and construction dates. However, management of the construction of block cave projects requires understanding of the strategic/tactical decisions that the project planners can take to increase the value of the project and cope with schedule risks. As block cave projects involve development of vertical and lateral access to the underground footprint and ore body, more attention to uncertainties is required as most of those projects need to confront delays leading to a decrease in value. The standard process of development and construction scheduling is often not planned with provisions to realise uncertainties in the construction phase. Uncertainties and risks such as poor ground conditions and equipment breakdowns are the primary reasons for schedule slippage. As a result most of these projects experience delays. In order to mitigate risk to the project schedule, we centre our attention on increasing the value of the project by spending more money upfront and improving the schedule rather than focus on minimizing the upfront capital. Scenario-based simulations along with project appraisal methods hold great promise to address those challenges and enable mine planners to make better decision and enhancing project value.
Keywords: Construction; Developments; Development; Model; Models; Projects; Simulations; Simulation; Risks;
Full Access to Technical Paper
PDF version for $20.00
Other papers from World Mining Congress