A new approach to maximize the natural conditioning system at Creighton Mine

CIM MEMO 2010
Abstract Creighton Mine is part of the mining history of Sudbury with more than 100 years of operation. Currently the deeper levels of the mine are reaching the 8000 ft level without implementation of mechanical refrigeration system as a result of the use of the Natural Heat Exchange Area (NHEA) over the past decades. The NHEA of Creighton Mine is part of an old block caving area divided into 4 blocks of trenches that were used to extract the ore. Currently, it is used year round to condition the outside temperature before the airflow enters the fresh air system of the mine. As the mine is progressing deeper, underground temperatures in the lower levels are starting to approach the limit of Vale Inco’s guidelines for working in heat. This paper presents the study developed to improve the management of the NHEA to obtain cooler temperatures at the intake of the ventilation system and outlines the impact to the mine in terms of the additional level(s) that could be operated underground without the use of mechanical refrigeration. This is another of the efforts currently under development for energy conservation and to reduce the capital and operational costs of Creighton Mine while extending the expected life of the mine.
Full Access to Technical Paper
PDF version for $20.00
Other papers from CIM MEMO 2010
Search
Sort By:  Relevance
Showing results 1 - 50 of 59
Text
Summary: see pdf
Proceedings: CIM MEMO 2010
Author(s): Chris Pritchard
Keywords: Ground control, Ground support, Micro-seismic, Rock mechanics
Year: 2010
Text
Proceedings: CIM MEMO 2010
Author(s): Damodara Reddy Chinnasane, Cecile Kelly, Luke Kempers, Mike Yao, Denis Thibodeau
Keywords: optimal design, Crown pillar, post pillars, Stability, Extraction Ratio
Year: 2010
Text
Proceedings: CIM MEMO 2010
Author(s): Martin Raymond Hudyma
Year: 2010
Text
Proceedings: CIM MEMO 2010
Year: 2010
Text
Proceedings: CIM MEMO 2010
Author(s): Fidelis T Suorineni, Peter K Kaiser
Keywords: Pillar stability, Failure mechanisms, Shear loading
Year: 2010
Text
Proceedings: CIM MEMO 2010
Author(s): Pavel Vasak
Year: 2010
Text
Proceedings: CIM MEMO 2010
Author(s): Fidelis T Suorineni, Peter K Kaiser, Humphrey K Lwitiko, Sean Maloney
Keywords: Stress change, Instrumentation, Burst-prone grounds, Hydrabolt
Year: 2010
Text
Proceedings: CIM MEMO 2010
Author(s): Fidelis Suorineni, Denis Thibodeau
Year: 2010
Text
Proceedings: CIM MEMO 2010
Keywords: Non-destructive testing, NDT, Shovels, Trucks, Crack Detection
Year: 2010
Text
Proceedings: CIM MEMO 2010
Keywords: Gear Inspection, Crown Gear Inspection, Mill Gear Inspection, Ball Mill Inspection, NDT, SAG Mill Inspection, Bull Gear Gear Inspection, Non Destructive Testing
Year: 2010
Text
Proceedings: CIM MEMO 2010
Author(s): Hanno Bertignoll
Year: 2010
Text
Summary: Abstract contained in the attached document.
Proceedings: CIM MEMO 2010
Year: 2010
Text
Summary: During the mining boom there was a shortage of new miners to our industry. Cementation felt that there was an urgent need to develop a training program for new miners. The training program was developed in 2004 and Cementation has successfully trained new miners in our training program and is currently working on a fifth training program. The New Miner Training program contributes to the development of long term relationships within our First Nation communities.
Proceedings: CIM MEMO 2010
Keywords: New Miner, Training Partnerships, Relationships, COMMUNITY INVOLVEMENT, First Nations, retention, Employer of Choice, Employment Opportunity, Training Program
Year: 2010
Text
Summary: The Kutcho Copper Project is located in northern British Columbia. This paper will review the history of the site and then focus on the optimization of the Preliminary Economic Assessment that was completed in September 2009. This process relied on assistance from the Cozamin Mine in Mexico, various consultants and peer review sessions, all of which had a beneficial contribution to the economic key performance indicators.
Proceedings: CIM MEMO 2010
Keywords: Projects, Capstone, Kutcho, Mining
Year: 2010
Text
Summary: Low quality rock is encountered in many manifestations in underground hard rock mines, ranging from weak and poorly consolidated rock to highly altered or foliated rock. Lateral mine developments driven in low quality rock pose on-going challenges to a mine operator, as ground stability issues, such as caving of under-supported ground, drift closure due to surface deformation or buckling processes, and degradation of exposed rock surfaces are a persistent concern.
For many operators, ground...
Proceedings: CIM MEMO 2010
Year: 2010
Text
Summary: Excessive vibration is known to have an adverse affect on soft body tissue and operators of heavy mining equipment can be exposed to vibration that exceeds levels recommended in international guidelines (ISO 2631-1, for example). Research has found that many of the seat and suspension systems currently used in mine haul trucks and load haul dump vehicles are actually amplifying the vibration. This overview presentation will outline the current research being conducted at Laurentian University...
Proceedings: CIM MEMO 2010
Author(s): Jim Dickey, Tammy Eger, Rob Caryn, Courtney Harnish, Katherine Plewa
Keywords: seating, whole-body vibration, heavy machinery
Year: 2010
Text
Summary: In recent years, in the integrated control project of collapse area, the government has invested great amount of funds for the restoration of Coal Mine collapse damaged infrastructure and house, also a certain amount of funds for land restoration, which is a benevolent and popular work, highly praised by the people. However, as collapse area problems in China are extensive and complex, especially the integrated control research of metal mine collapse area has less investment, weak technologic...
Proceedings: CIM MEMO 2010
Author(s): Jian Jun HU
Keywords: collapse area, integrated control, Technological development, metal mine
Year: 2010
Text
Summary: Until 2009, the Mouska Mine was a conventional underground mine, using primarily shrinkage mining to extract the narrow veins that contain its mineralization. As milling occurs at the Doyon Mill site, approximately 4 km away, the use of paste backfill had never been practical. However, upon cessation of mining operations at the Doyon Mine, the paste backfill plant became available for use by Mouska. Because milling operations are temporarily suspended, awaiting batch processing later in 2010,...
Proceedings: CIM MEMO 2010
Author(s): Jacques Bédard
Year: 2010
Text
Summary: The introduction of the National Instrument (NI) 43-101 Standards of Disclosure for mineral projects has led to some very specific requirements for reporting mineral resource estimates for mineral projects to the public. The mineral resource estimate is based on the qualified person(s) completing the work to accepted industry practices and their experience. There is no one document that prescribes what is considered accepted industry practices. There are published guidelines provided by...
Proceedings: CIM MEMO 2010
Author(s): Paul Palmer, Kevin Palmer
Year: 2010
Text
Summary: PT Freeport Indonesia (PTFI) operates copper and gold mining operations in a mountainous area of the Mimika regency, near Tembagapura, Papua (formerly, Irian Jaya), Indonesia.

The mining and concentrating operations typically produce 240,000 metric tonnes per day of Copper and Gold ore from the combined mining of an 80,000 tonnes per day (ore) block cave operation (DOZ Mine) and a 160,000 tonnes per day (ore) open pit mining operation (Grasberg Open Pit). The Grasberg Open pit mine will be...
Proceedings: CIM MEMO 2010
Year: 2010
Text
Summary: Over the past 30 years, underground paste backfill systems have been implemented across the globe in many configurations each with a primary focus of providing high quality backfill to enhance mine operations. However a number of key design drivers are not always well understood within design engineering firms that occasionally undertake this work, leaving opportunities on the table. Perhaps not always obvious to those newly embracing paste technology, identifying key drivers and opportunitie...
Proceedings: CIM MEMO 2010
Author(s): Bruno Mandl
Keywords: Optimization, Paste backfill, Case studies
Year: 2010
Text
Summary: Traditionally in hard rock mining, large diameter raise boring was thought of as 3.04 metre or 3.66 metre diameter holes 300 metres deep. Mine and ventilation engineers were challenged to design
systems either incorporating such holes, or slashing and modifying to suit. Now, 5.49 metre diameter holes up to 1,000 metres deep are being excavated. The ability to pilot and ream such holes not only creates new options for mine engineers in mine ventilation system design, but also creates new...
Proceedings: CIM MEMO 2010
Author(s): Dennis Martin
Keywords: Hard rock, risk and mitigation, Waste, Procurement, Deep shaft, large diameter, contractual format, Safety, raise bore, geotechnical
Year: 2010
Text
Summary: Creighton Mine is part of the mining history of Sudbury with more than 100 years of operation. Currently the deeper levels of the mine are reaching the 8000 ft level without implementation of mechanical refrigeration system as a result of the use of the Natural Heat Exchange Area (NHEA) over the past decades. The NHEA of Creighton Mine is part of an old block caving area divided into 4 blocks of trenches that were used to extract the ore. Currently, it is used year round to condition the...
Proceedings: CIM MEMO 2010
Year: 2010
Text
Summary: Lighting technology has evolved dramatically over the past 30 years. From the introduction of the High Intensity Discharge (HID) arc lamp, to the oil embargo driven push for energy efficiency in the 1970s, the European driven push to high efficiency fluorescent systems characterized by the “T8” and “T5” lamps and the electronic ballast to LED there has almost never been a dull moment in lighting over the past 30 years.

The development of LED – thought of as an upstart and a “not-quite-ready...
Proceedings: CIM MEMO 2010
Keywords: Bright future, Control, Efficiency
Year: 2010
Text
Summary: Dust abatement is possible on bulk materials, whether conveyed or stockpiled. Minimum (ppm) quantities of chemical additives can efficiently and rapidly control dust of conveyed substrates with no effect on floatation chemistry. Top coating of large surface areas can control surface dust and wind erosion. Environmental and toxicity impact must be considered in any treatment, especially on areas with percolation runoff, leachates, or limited containment. The most effective dust control is...
Proceedings: CIM MEMO 2010
Keywords: Tailing, Smart technology, Dust, Environmental, Erosion
Year: 2010
Text
Summary: A Deep Geologic Repository (DGR) for the long-term management of operational Low and Intermediate Level Radioactive Waste (L&ILW) is being proposed by Ontario Power Generation at
the 932-ha Bruce site. The Bruce site is located approximately 225 kilometres northwest of Toronto near Tiverton, Ontario. The project is currently in the environmental assessment and regulatory approvals phase. This paper describes OPG’s proposed DGR including the underground repository concept comprised of...
Proceedings: CIM MEMO 2010
Author(s): Ian Pritchard, Derek Wilson
Year: 2010
Text
Summary: Technology in mining has historically been very difficult to implement. With such a complex industry, it seems as if, for the most part, the introduction of new technology into mining has either been overlooked or has been met with some resistance. So many of the processes in mining could be improved today with relatively little change in thinking from the status-quo.
With the changing global marketplace, mining companies can not afford to continue to use outdated and antiquated technologies....
Proceedings: CIM MEMO 2010
Author(s): Ryan Siggelkow
Keywords: Safety, Infrastructure, Automation, Productivity, cost effectiveness, Improvement, Dependability, Efficiency, Processes, Sustainability
Year: 2010
Text
Summary: The failure of the multi –piece wheels commonly used on heavy mining vehicles has caused fatalities and serious injuries to underground and surface workers. Experience has dictated that these types of wheel configurations require careful assembly, appropriate maintenance, and overall management to ensure they safely contain the high pressures and volumes of air that are required to support the vehicle loads. This presentation will outline the current research being conducted at the...
Proceedings: CIM MEMO 2010
Author(s): William J. Altenhof, Weldon Li, Aleksander Tonkovich
Keywords: multi-piece, finite element modeling, wheel, structural testing
Year: 2010
Text
Summary: Brunswick Mine, an underground lead and zinc mine located near Bathurst, New Brunswick, has been in operation since 1964. During the last 46 years, metal prices have fluctuated and mining has adjusted accordingly. As the end of the mine life draws near, it is critical to mine the ore reserves to their full potential. Since 2007, a final review of the resources and remnants was set in motion by the mine engineering and geology departments to maximize ore extraction. The use of “new”...
Proceedings: CIM MEMO 2010
Author(s): Guy Bourque
Keywords: Economics, Resources, Brunswick Mine
Year: 2010
Text
Summary: Port site developments for mining and petroleum projects in Alaska and Canada are typically very remote and exposed to any number of extreme elements including crushing ice loads, large wave forces, significant seismic activity and large berthing forces. Sheet pile cellular type docks are particularly well suited for remote locations because they can reuse mine overburden material, easily be adapted to field conditions encountered, economically transported to the site and utilize standardize...
Proceedings: CIM MEMO 2010
Keywords: Economics, Remote, Port, Infrastructure
Year: 2010
Text
Summary: To take advantage of a project’s financial opportunities, as well as improve the cash flow and the return on Investment, project schedule can be accelerated to complete the project earlier than planned. Project schedule acceleration can be achieved by using new analytical tools, such as Schedule Optimization, Schedule Reduction, Schedule Crunching or a combination of any of these concepts.

Schedule Optimization does not entail any extra costs; however, other acceleration methods such as...
Proceedings: CIM MEMO 2010
Keywords: Innovation, Cost savings, Schedule optimization, Revenue targets, acceleration
Year: 2010
Text
Summary: Xstrata’s Nickel Rim South Mine is located in Sudbury Basin of Ontario. The opening of this mine represented the first new stand-alone mine in the basin in nearly 20 years. The mine was designed to be a 3000 tpd underground mine, operating to a depth of 1800m. Nickel Rim South (NRS) has two shafts, one for exhaust air the other for intake air, personnel, and rock haulage.
In the winter of 2009 the installation of two centrifugal main exhaust fans was completed, with commissioning in the...
Proceedings: CIM MEMO 2010
Author(s): Arsalan Talebzadeh
Keywords: Commissioning, changeover, Nickel Rim, Ventilation, Safety, Production, Underground, Exhaust, Intake, Fans
Year: 2010
Text
Summary: Mines in Canada and the United States are subject to regulations limiting nitrate, nitrite and ammonia levels in mine effluents. The primary source of these water quality constituents is the explosive used in blasting operations, and ammonium nitrate (AN) remains a significant component of most explosives used in the mining industry. The amount of AN entering a local system is related to the site conditions, explosives used, explosive handling and blast efficiency.
Most mining operations...
Proceedings: CIM MEMO 2010
Author(s): Daniel J. Corkery, Nicolas Lauzon, David L. Sprott
Keywords: Water quality, Environment, ANFO, Emulsion, Mining, Explosives
Year: 2010
Text
Summary: ABSTRACT: The mining of the 880 ore body at Copper Cliff Mine accounts for more than 50% of the mine’s scheduled production. The Vertical Retreat Mining method is used with stopes that are typically 150-ft in height and 50-ft by 50-ft on section. Most of the stoping is transverse with mining starting on the hangingwall and retreating to the footwall contact. A mine-and-fill process is used to control the volume of open ground and to also mitigate ground stability issues within the stopes...
Proceedings: CIM MEMO 2010
Author(s): Samantha Espley
Year: 2010
Text
Summary: Open pit design and production scheduling is a complex and intricate process that defines the sequence of ore and waste extraction during the life-of-mine and up to some ultimate pit limit. This process deals with the management of cash flows in the order of hundreds of millions of dollars and, arguably, underpins mine value, performance and success of the industry. Uncertainty in the metal/ore and waste forecasted to be produced from a pit has a major financial impact on both the valuation...
Proceedings: CIM MEMO 2010
Keywords: Optimization, Uncertainty, Strategic mine planning, Mine design, Production Scheduling
Year: 2010
Text
Summary: Risk assessment is paramount for the design of underground mining operations and the optimization of planning in their development and production schedules. Feasibility studies of green field or brown field capital projects require the increase of confidence in performance estimates and economic milestones related to cost, recovery, and productivity parameters. While market and geological risks can be assessed through a forecasting analysis based on historical and orebody data respectively,...
Proceedings: CIM MEMO 2010
Author(s): Vassilios Kazakidis
Year: 2010
Text
Summary: As mining catches up with the technological explosion of the 21st century the question becomes – How do we successfully implement this into our daily business?

At Diavik Diamond Mines Inc. the vision has been to transition from the open pit mine to the underground workings incorporating the latest technology available. With this in mind a team was designated to work with Atlas Copco Construction and Mining to bring Automation into the way business was done. A reference trip was organized...
Proceedings: CIM MEMO 2010
Author(s): Lori-Anne Fleming
Year: 2010
Text
Summary: Frozen backfill for mining operations in permafrost must be delivered in such a state so as not to thermally impose on the host rock surrounding the filled stope. The placement process, the material strength demand, and the freezing time delay are the parameters that control the applicability of the method. The thermal properties, initial temperatures, and mix ratio of the constituent materials can be used in a simple thermodynamic equilibrium model to predict the final temperature of the...
Proceedings: CIM MEMO 2010
Author(s): Vassilios Kazakidis
Year: 2010
Text
Summary: Most mining and mineral exploration companies’ operate in remote locations, either in Canada or internationally. Not knowing the cultural imprint of your team and the places where your company is active, may led into trouble.

To set the foundation for a better world, it’s important to built trust and relationships within your global team, communities and stakeholders. Building the “invisible asset” and developing intercultural awareness is an important part of the leadership programs for the...
Proceedings: CIM MEMO 2010
Author(s): Adriana Mafalda Arias
Keywords: CSR, awareness, Cultural, responsible, intercultural, citizen, sensitivity, global team, Leadership
Year: 2010
Text
Summary: Portland cement is primarily used to solidify backfill in underground mine workings and it represents a major cost in mining operations. CANMET MMSL has invented an alternative binder technology that does not contain any amount of Portland cement and is made using waste materials, such as development rock and smelter slag. The technology has been successfully tested with many types of base metal and ferrous slag. Research conducted in collaboration with several mining operations in Canada...
Proceedings: CIM MEMO 2010
Author(s): Kristie Tarr
Keywords: Alternative binder, Backfill
Year: 2010
Text
Summary: Laurentian University is situated in the heart of one of Canada’s most important areas of natural resources exploitation. The university is strategically located with respect to several major mining camps, including those of Vale, Xstrata, Kidd Creek, Hemlo, Red Lake, Placer Dome, and mines in Northwestern Quebec. It is also close to E.B. Eddy’s major wood processing facilities at Espanola, and is at the centre of a vibrant and growing services sector for natural resources industries. In...
Proceedings: CIM MEMO 2010
Author(s): Marty Hudyma, Markus Timusk, Ed Guerra
Keywords: Mineral resources, Chemical Engineering, Mechanical Engineering, Mining engineering, NATURAL RESOURCES
Year: 2010
Text
Summary: Stability of pillars is essential in achieving maximum safety and economic values in room-and-pillar and block cave mining projects. Today’s economic market is motivating underground mining companies to increase development advance rates and enhance their NPVs. There is a drive to move away from the conventional drill-and-blast as the main excavation method to alternative means such as mechanized excavation. The cyclic nature of drill and blast, and its inherent tendency to damage the...
Proceedings: CIM MEMO 2010
Author(s): Navid Bahrani, Fidelis T. Suorineni, Sean Maloney
Year: 2010
Text
Summary: Engineers Canada is the national organization of the 12 provincial and territorial engineering associations who license Professional Engineers in Canada. Engineers Canada acts as the voice of its members in national and international affairs, and is charged with delivering national programs related to engineering education, professional qualifications and professional practice as well as conducting research activities to monitor the pulse of the engineering profession in Canada. To...
Proceedings: CIM MEMO 2010
Year: 2010
Text
Summary: Looking at modern mining equipment, especially jumbos, an obvious feature is the number, variety, and length of hydraulic hoses used. This reduces the maneuverability of the machine, increases the chances of hose failure and increases downtime in finding the leak, unbundling the hoses, replacing and reassembling the unit. In addition, many hydraulic systems recycle fluid at the pump in order to reduce lag time for functions. This wastes power and adds potential for fluid loss.
An alternative...
Proceedings: CIM MEMO 2010
Year: 2010
Text
Summary: Microalgae and the Mining Industry: A Research
Review

L. Renaud, J.A. Scott, H. Shang, G.M. Ross, B.
Salt, M. Loken

Abstract: For generations, the mining industry has
been committed to work toward developing new
technology that can improve safety and increase
production. Now with a more environmentally
conscious society and stiffer environmental
regulations, a natural progression for the
industry is to develop “green” or environmentally
friendly technologies. Not only could this...
Proceedings: CIM MEMO 2010
Author(s): Ashley Scott, Helen Shang, Greg Ross, Bryan Salt, Mike Loken
Year: 2010
Text
Summary: Laser Scanning (HDS)
More Accurate Information + Tighter Designs = Less Field Work and Re-Work
By Rod Abbott, A.Sc.T.

High Definition Scanning (laser scanning) is a proven technology that is accurate to within ¼” in 150’ (6mm in 50m). It can capture in excess of one million 3D point measurements in an average 2 hours scan. It has numerous applications including brown-field retrofits, bridge measurement and analysis, to verify as-built conditions, and crime scene investigation. We...
Proceedings: CIM MEMO 2010
Year: 2010
Text
Summary: Condition-based maintenance is replacing preventive maintenance in many industrial operations as a result of gains in productivity. Preventive maintenance is strictly time-based which means that as long as the prescribed time is sufficiently short, failures are prevented.

The trade offs between shorter cycles and increased downtime is a fine balancing act. Condition-based maintenance is gaining momentum as the more cost-effective and greener solution to finding the optimal maintenance cycle...
Proceedings: CIM MEMO 2010
Keywords: Equipment maintenance, wireless monitoring, wireless strain sensor, wireless vibration sensor, increased productivity, wireless strain gauge, wireless instrumentation, Maintenance System, strain and vibration monitoring, condition-based maintenance
Year: 2010
Text
Summary: This paper presents experiences and views of “Women in Mining” as determined from a survey conducted with women across the Canadian mining industry. The women represent many different areas within the mining industry including a broad range of roles in industry, government, academia and in the supplies and services sector.

The survey data is summarized to provide insight into a range of experiences of women in mining along with feedback on possible concepts for consideration in improving...
Proceedings: CIM MEMO 2010
Author(s): Donna Beneteau, Samantha Espley
Year: 2010
Text
Summary: The mining industry has come to rely on imaging devices to monitor and record all kinds of
activities. We use them to measure, improve the process, ensure security, increase production
and automate machinery. Cameras can be installed in locations most people wouldn’t want to
live and be our “eyes” to record the events at that location.
This paper discusses digital imaging, the equipment, methods, techniques and information that can be learned in the drilling, blasting, crushing, grinding,...
Proceedings: CIM MEMO 2010
Author(s): Tom Charles Palangio, Thomas William Palangio
Keywords: Optimization, blast size measurement, flotation monitoring, energy reduction, Image analysis, Process control, borehole cameras, Fragmentation analysis
Year: 2010
Text
Summary: Evolution of a Mine Development System – Tunnel Boring Machine… international collaboration and people management required for success
By Neil Brown, P.Eng.

In 1998, Cameco’s Mine Development System tunnel boring machine (MDS#1) drove its inaugural tunnel at the Cigar Lake site in Saskatchewan, Canada - the world’s largest undeveloped high-grade uranium deposit. Cameco engaged Wardrop in 1999 to take over site technical support for the MDS’ electrical and control systems.

Wardrop helped...
Proceedings: CIM MEMO 2010
Keywords: International, Evolution, Development System, Mine, Cameco, innovative, Maintenance, Design, Collaboration, Engineering
Year: 2010