Adaptation of the long-wall mining method with a platform

CIM MEMO 2008
Abstract This presentation will explain a new mining method developed at the Sleeping Giant Mine with Camroc division and Canmet. The Long Wall method is use when you have a narrow vein with dip between 40 to 60 degrees. The presentation will talk about the positives and the negatives aspects.
Keywords: Long Wall adapted, narrow vein, Platform, new mining method
Full Access to Technical Paper
PDF version for $20.00
Other papers from CIM MEMO 2008