Sommaire: A modular gold processing unit (MGPU) was designed, installed and operated over an eight-month period by RSW-Béroma at the Granada mine located near Rouyn-Noranda, Quebec. A description of the project geology, plant set up, as well as exploitation results, including productivity and profitability curves, are given for a small-scale mining operation in comparison with larger ones.
Publication: CIM Bulletin
Auteur(s): L. Cabot, P. Trudel, É. Cabot
Numéro: 1072
Volume: 96
Année: 2003
Texte
Sommaire: The application of biologically assisted methods for metal extraction in the mining industry has a long history, but development of modern techniques has been relatively slow. There is, however, a resurgence of interest in the industry with the recent development of methods to successfully treat base metals concentrates. Two major pilot plant programs for treatment of chalcopyrite concentrates have been initiated in the past year and results from one are beginning to be released. This paper...
Publication: CIM Bulletin
Auteur(s): A.R. Marchbank, E. Kirby, F.F. Roberto
Numéro: 1072
Volume: 96
Année: 2003
Texte
Sommaire: Competitive pressures dictate that the mining industry moves to larger mobile underground haulage equipment with more advanced equipment mechanization, higher levels of autonomous operation of machines, and longer periods between access by maintenance personnel. Since such new machines will of necessity be more complex than existing designs, machine reliability has become a key issue in progressing toward advanced mobile underground haulage equipment. Reliability and maintainability models of...
Publication: CIM Bulletin
Auteur(s): R.A. Hall, L.K. Daneshmend
Numéro: 1072
Volume: 96
Année: 2003
Texte
Sommaire: This paper reviews the Falconbridge-SMRQ’s Raglan project in northern Quebec and the process that was used in developing its current long-term mine plan. Challenges were many and not only limited to the longevity of the project, numerous ore deposits (both underground and open pit), and a 40 km property strike length. As a result of its remote northern location, other factors such as progressive reclamation, leachable mine waste, water treatment, and waste management were also part of the...
Publication: CIM Bulletin
Auteur(s): L.W.T. Weitzel
Numéro: 1072
Volume: 96
Année: 2003
Texte
Sommaire: Sustainable development in the mining and metallurgical industrial sectors can be implemented by two distinct groups: the managers and operators of existing facilities, working with industrial processes and systems that have been operating for many years, in some cases, several decades; and those who are engineering and building new facilities or upgrades of existing plants. The focus of this paper is to look at approaches and tools available to bring sustainable development thinking and...
Publication: CIM Bulletin
Auteur(s): G.E. Forward, R.J. Milbourne, J.B. Farrell, J.R. Yates, R.J. Young