Removal and destruction of ammonia from a uranium plant effluent

Cette publication n'est pas offerte dans votre langue; certains de ses renseignements ont été préremplis pour la version française.
Accés complet à Document technique
Version PDF pour 20,00 $
Recherche
Trier par :  Pertinence
Affichage des résultats 1 - 6
Texte
Sommaire: None.
Publication: CIM Bulletin
Auteur(s): C. Siac
Numéro: 1075
Volume: 96
Année: 2003
Texte
Sommaire: The ability to adjust the speed of a SAG mill offers benefits to the process and to equipment maintenance. It can be provided
with some slight effect on availability ranging
from somewhat enhanced to somewhat
reduced, depending on the particular equipment that is used. Several techniques have been developed for monitoring the magnitude of the contained charge, and several algorithms have been used to control mill feed rate and mill speed. The various benefits and the means by which they can...
Publication: CIM Bulletin
Auteur(s): M.N. Brodie
Numéro: 1075
Volume: 96
Année: 2003
Texte
Sommaire: Pitting corrosion inhibition of 304 stainless
steel (SS) in groundwater with a ternary inhibitor mixture (phosphonic acid + bivalent cation + various surfactants) was studied with different environmental variables such as temperature, pH, dissolved oxygen and chloride ions. Critical pitting potential and corrosion potential were calculated for these test media using electrochemical techniques. Under the tested condition, the localized corrosion resistance of 304 SS was determined and the...
Publication: CIM Bulletin
Auteur(s): D. Gopi, S. Rajeswari
Numéro: 1075
Volume: 96
Année: 2003
Texte
Sommaire: Improving mill grade recovery relationships
is always good business. Inco’s Clarabelle
mill has just undergone a $16 M process upgrade that was designed to improve nickel recovery by 2%. The “Mill Redesign Project” was completed on time, under budget and delivered the promised improvement in recoveries. This paper describes the methodology of the Mill Redesign Project team, details of the process improvements and the critical success factors that helped the team deliver on its promises. With...
Publication: CIM Bulletin
Auteur(s): A. Kerr, A. Bouchard, J. Truskoski, J. Barrett, G. Labonté
Numéro: 1075
Volume: 96
Année: 2003
Texte
Sommaire: In 1995, Louvicourt mine started one of the first paste backfill operations in Canada. From 500 000 t in 1995, the annual paste backfill tonnage produced reached 800 000 t in 1999. The maximum throughput of the surface plant (including binders) is 3500 tpd with a final density of 75% to 76% solids which gives a slump of 15 cm to 17 cm. Following the start-up of the paste backfill plant, the backfill
strength performance levels were well below
the pilot plant’s predictions. The introduction
of...
Publication: CIM Bulletin
Auteur(s): J. Cayouette
Numéro: 1075
Volume: 96
Année: 2003
Texte
Sommaire: A large-scale panel destress blast was fired at Brunswick mine in the fall of 1999 in order to reduce the ground stresses in a critically
important neighbouring mining region. This work, sponsored by the Mining Division of CAMIRO and Brunswick mine, consisted in
heavily choke-blasting — and subsequently
leaving in place — a massive waste sulphide
pillar in the southwest end of the 1000 m level.
This paper describes the approach and design methodology used to try to maximize breakage in the...
Publication: CIM Bulletin
Auteur(s): P.P. Andrieux, R.K. Brummer, Q. Liu, B.P. Simser, A. Mortazavi
Numéro: 1075
Volume: 96
Année: 2003
Activé par Coveo Enterprise Search