The changing role of the Construction Group of the Project Development Division of Placer Dome Inc.

Cette publication n'est pas offerte dans votre langue; certains de ses renseignements ont été préremplis pour la version française.
Mots clés : Project management;Mine construction
Accés complet à Document technique
Version PDF pour 20,00 $
Recherche
Trier par :  Pertinence
Affichage des résultats 1 - 6
Texte
Sommaire: N/A
Publication: CIM Bulletin
Auteur(s): D. White, H. Helmstaedt, R. Harrap, P. Thurston
Mots clés: Technical Note
Numéro: 1017
Volume: 91
Année: 1998
Texte
Publication: CIM Bulletin
Auteur(s): <b>D. S. Case</b>, P.C. Copeland, Landye, Bennett and Wolf, L.L.P.<br>Anchorage, Alaska, U.S.A.
Numéro: 1017
Volume: 91
Année: 1998
Texte
Sommaire: An acidification circuit was installed and operated at the Agnico-Eagle Silver Division refinery in Cobalt, Ontario, for treating ~300 m3 of a concentrated cyanide waste solution with the purpose of recovering its cyanide and metal values. The acidification circuit was designed from parameters determined experimentally at CANMET. Available refinery equipment was assembled according to a flowsheet developed by Agnico-Eagle Mines. The process produced a regenerated cyanide solution containing...
Publication: CIM Bulletin
Auteur(s): P.A. Riveros, R. Molnar, F. J. Basa
Mots clés: Hydrometallurgy, Cyanide recovery, Cyanide waste.
Numéro: 1017
Volume: 91
Année: 1998
Texte
Sommaire: In order to determine the feasibility of a hydraulic ore hoisting installation, the optimal operating conditions were calculated for applying such a system at the Detour Lake Mine of Placer Dome Ltd. Next, a financial analysis was conducted in order to estimate the cost per tonne for hydraulic hoisting of the ore. Subsequently, the cost per tonne was compared with the hoisting costs associated with a new borehole hoist. Installing a hydraulic ore hoist at Detour Lake Mine was found to be...
Publication: CIM Bulletin
Auteur(s): J.G.L. Bekkers, H.J. Glass
Mots clés: Detour Lake Mine, Feasibility studies, Hoisting, Underground mining.
Numéro: 1017
Volume: 91
Année: 1998
Texte
Sommaire: The Research and Design group of the Project Development Division (PDD) of Placer Dome Inc. includes metallurgical, electrical, civil and mechanical engineers. They provide metallurgical research and conceptual flowsheet development, feasibility concepts for the processing and ancillary facilities, and manage the detailed design of the facilities once approval has been given to a mining project. This paper describes how this group works, within the Project Development Division, to help...
Publication: CIM Bulletin
Auteur(s): J.K. Gowans
Mots clés: Mine design, Project development.
Numéro: 1017
Volume: 91
Année: 1998
Texte
Sommaire: The diamondiferous Drybones Bay kimberlite pipe is the largest pipe (900 m by 400 m) discovered to date in the Northwest Territories. The pipe intrudes granodiorite of the Archean age Defeat Pluton and contains crater, reworked crater (epiclastic) and diatreme facies kimberlite. In-situ measurements of seismic p-wave velocity were recorded with in-line refraction arrays over representative areas. Refractions from fresh kimberlite were recorded over epiclastic facies kimberlite in the eastern...
Publication: CIM Bulletin
Auteur(s): M.A. Power
Mots clés: Diamondiferous kimberlite pipes, Drybones Bay kimberlite pipe, Northwest Territories.
Numéro: 1017
Volume: 91
Année: 1998
Activé par Coveo Enterprise Search