A different role in designing new mining projects.

Cette publication n'est pas offerte dans votre langue; certains de ses renseignements ont été préremplis pour la version française.
Mots clés : Mine design
Accés complet à Document technique
Version PDF pour 20,00 $
Recherche
Trier par :  Pertinence
Affichage des résultats 1 - 6
Texte
Sommaire: N/A
Publication: CIM Bulletin
Auteur(s): D. White, H. Helmstaedt, R. Harrap, P. Thurston
Mots clés: Technical Note
Numéro: 1017
Volume: 91
Année: 1998
Texte
Publication: CIM Bulletin
Auteur(s): <b>D. S. Case</b>, P.C. Copeland, Landye, Bennett and Wolf, L.L.P.<br>Anchorage, Alaska, U.S.A.
Numéro: 1017
Volume: 91
Année: 1998
Texte
Sommaire: An acidification circuit was installed and operated at the Agnico-Eagle Silver Division refinery in Cobalt, Ontario, for treating ~300 m3 of a concentrated cyanide waste solution with the purpose of recovering its cyanide and metal values. The acidification circuit was designed from parameters determined experimentally at CANMET. Available refinery equipment was assembled according to a flowsheet developed by Agnico-Eagle Mines. The process produced a regenerated cyanide solution containing...
Publication: CIM Bulletin
Auteur(s): P.A. Riveros, R. Molnar, F. J. Basa
Mots clés: Hydrometallurgy, Cyanide recovery, Cyanide waste.
Numéro: 1017
Volume: 91
Année: 1998
Texte
Sommaire: The Construction Group is responsible for the construction of all of Placer DomeÕs major projects and contributes to the development of most major feasibility studies. This group includes an international collection of Placer Dome people who have built mines in Papua New Guinea, Australia, Chile, the United States and Canada. This paper outlines the changing role of the Construction Group from the early days of single projects to today, when several projects are in various phases from...
Publication: CIM Bulletin
Auteur(s): M.A. Creaney
Mots clés: Project Management, Mine construction, Construction.
Numéro: 1017
Volume: 91
Année: 1998
Texte
Sommaire: In order to determine the feasibility of a hydraulic ore hoisting installation, the optimal operating conditions were calculated for applying such a system at the Detour Lake Mine of Placer Dome Ltd. Next, a financial analysis was conducted in order to estimate the cost per tonne for hydraulic hoisting of the ore. Subsequently, the cost per tonne was compared with the hoisting costs associated with a new borehole hoist. Installing a hydraulic ore hoist at Detour Lake Mine was found to be...
Publication: CIM Bulletin
Auteur(s): J.G.L. Bekkers, H.J. Glass
Mots clés: Detour Lake Mine, Feasibility studies, Hoisting, Underground mining.
Numéro: 1017
Volume: 91
Année: 1998
Texte
Sommaire: The diamondiferous Drybones Bay kimberlite pipe is the largest pipe (900 m by 400 m) discovered to date in the Northwest Territories. The pipe intrudes granodiorite of the Archean age Defeat Pluton and contains crater, reworked crater (epiclastic) and diatreme facies kimberlite. In-situ measurements of seismic p-wave velocity were recorded with in-line refraction arrays over representative areas. Refractions from fresh kimberlite were recorded over epiclastic facies kimberlite in the eastern...
Publication: CIM Bulletin
Auteur(s): M.A. Power
Mots clés: Diamondiferous kimberlite pipes, Drybones Bay kimberlite pipe, Northwest Territories.
Numéro: 1017
Volume: 91
Année: 1998
Activé par Coveo Enterprise Search