Les Mines Gaspe — Smelter Operations

Cette publication n'est pas offerte dans votre langue; certains de ses renseignements ont été préremplis pour la version française.
Mots clés : Metallurgy;Smelter operations;Les Mines Gaspe
Accés complet à Document technique
Version PDF pour 20,00 $
Recherche
Trier par :  Pertinence
Affichage des résultats 1 - 4
Texte
Publication: CIM Bulletin
Auteur(s): W.G. Jeffery
Mots clés: MITEC, Research and development.
Numéro: 973
Volume: 86
Année: 1993
Texte
Sommaire: Mine management now recognizes the value of computer-based truck-shovel dispatching in open pit mines. The key tangible benefits are substantial productivity increases with a given fleet of equipment or, alternately, significant reductions in equipment required to meet production quotas. In this paper, the authors review the literature, report on efficient, optimal algorithms for haul truck dispatching in real-time, and briefly discuss methods used by various mines to evaluate productivity...
Publication: CIM Bulletin
Auteur(s): J. Wm. White
Mots clés: Computer applications, Equipment, Open Pit mining, Production.
Numéro: 973
Volume: 86
Année: 1993
Texte
Sommaire: An interactive mine planning package has been developed to aid with the tasks involved in generating dragline mine plans. This package employs recent advances in PC-based, 3D computer graphics and 3D geologic modelling. A Gridded Seam Model (GSM), capable of modelling rugged topography and multiple coal seams, including folding and faulting, is used to generate the geologic database. This model is then integrated with an interactive graphics mine planning system in order to develop one model...
Publication: CIM Bulletin
Auteur(s): Louise H. Michaud
Mots clés: Computer applications, Grid seam modelling, Open pit mining, Draglines, Mine planning systems.
Numéro: 973
Volume: 86
Année: 1993
Texte
Sommaire: The Western Research Centre (WRC) of CANMET located in Devon, Alberta, is a modern research facility offering services ranging from fundamental research to pilot plant investigations. Recently, a 0.76 metre diameter by 7.9 metre high Flotaire column flotation cell was installed as a demonstration unit for Canadian coal producers. Because the column cell is intended to be used for research, development and demonstration, WRC recognized that additional sensing equipment and improved process...
Publication: CIM Bulletin
Auteur(s): D.B. Hyma, A.I.A. Salama
Mots clés: Column flotation, Process control, Coal preparation, Mineral processing, Fine coal recovery.
Numéro: 973
Volume: 86
Année: 1993
Activé par Coveo Enterprise Search