A study of problems relating to mining engineering university education

Cette publication n'est pas offerte dans votre langue; certains de ses renseignements ont été préremplis pour la version française.
Mots clés : Human Resources;Education
Accés complet à Document technique
Version PDF pour 20,00 $
Recherche
Trier par :  Pertinence
Affichage des résultats 1 - 10
Texte
Sommaire: This article is based on a paper presented by Jim Scott at the 1988 annual convention of the Prospectors and Developers Association of Canada. The paper suggests a number of factors that might be taken into account in negotiating royalty terms.
Publication: CIM Bulletin
Auteur(s): ROBERT B. PARSONS
Numéro: 932
Volume: 82
Année: 1989
Texte
Sommaire: The environmental impact of the Rabbit Lake project is presented. Baseline data for fish, water, air and radon collected in 1973, 1975,1980 and 1986, are compared with post-development environmental monitoring data. Predicted environmental impacts for the developed Rabbit Lake and B-zone deposits are compared to the actual impacts.
Publication: CIM Bulletin
Auteur(s): R.L.J. Phillips
Mots clés: Environment, Rabbit Lake, Uranium.
Numéro: 932
Volume: 82
Année: 1989
Texte
Sommaire: This paper deals with the history, development, present and future of the Employee Assistance Programs in place at the Inco Ltd. operations in Thompson, Manitoba. It should be noted that, although many similar programs exist in various industries and jurisdictions, these programs had to be fine-tuned to meet the needs of Inco employees, having in mind the helping professional resources available in Thompson and its geographic location.
Publication: CIM Bulletin
Auteur(s): K. MacMASTER
Mots clés: Human resources, Employee assistance programs, Management, Labour.
Numéro: 932
Volume: 82
Année: 1989
Texte
Sommaire: Since its startup in 1975, the Rabbit Lake mill has been modified to process both increased tonnage and higher grade ore.
Ore initially came from the Rabbit Lake pit. In 1985, a major mill expansion was commissioned to allow treatment of B-zone pit ore, which is mineralogically and metallurgically different from Rabbit Lake pit ore.
Mill modifications, and the changing ore characteristics and processing targets which made them necessary, are described.
Publication: CIM Bulletin
Auteur(s): W.W. Milde
Mots clés: Mineral processing, Rabbit Lake, Milling.
Numéro: 932
Volume: 82
Année: 1989
Texte
Sommaire: The mining of the ore bodies at Rabbit Lake has in the past been by the open pit method. This method is presently being used to develop the B-zone and will continue into the future with the development of two smaller ore bodies, the A-zone andD-zone. The Eagle Point orebody will be developed by an underground method which will provide production and employment into the next century.
The ore bodies at B-zone, A-zone and D-zone are unique in that they are located under Wollaston Lake. To permit...
Publication: CIM Bulletin
Auteur(s): G.W. Clark
Mots clés: Rabbit Lake project, Mine development, Open pit mining, Dyking, Uranium.
Numéro: 932
Volume: 82
Année: 1989
Texte
Sommaire: The requirements for a metallurgical acid plant treating smelter gases are both unique and demanding in terms of sulphur dioxide treatment and emission control. Since start up in 1981, the copper smelter at the Kidd Creek Division of Falcon-bridge Limited has undergone several major expansions. The expansion and modification of the acid plant has been an integral part of this process. Both production demands and government regulations dictate that this metallurgical acid plant be unique in...
Publication: CIM Bulletin
Auteur(s): R.J. St. Eloi, C.J. Newman, D. A. Bordin
Mots clés: Sulphur dioxide emissions, Acid rain, Kidd Creek copper smelter, Emission control, Metallurgy.
Numéro: 932
Volume: 82
Année: 1989
Texte
Sommaire: Performance management is a systematic, practical approach to managing people. It is founded on some basic assumptions about people and is designed to focus on people in the work place. Organizing meaningful information and using it to involve people is a cornerstone of this system.
Some common sense practices are developed to involve people in an organization's effort to improve performance. The successful implementation of this program requires solid commitment and total involvement from...
Publication: CIM Bulletin
Auteur(s): B.L DOREY
Mots clés: Human resources, Performance management, Performance indicators, Behaviours.
Numéro: 932
Volume: 82
Année: 1989
Texte
Sommaire: The Rabbit Lake story began in the late sixties and will continue -well into the twenty-first century. It is a story of success, of multiple ore body discoveries, of unique systems, and new methods made possible through innovative and state-of-the-art design. Two quite different geological systems host the five ore bodies mined, or slated to be mined. These two systems have yielded two distinct ore types, each with characteristic minera-logicalproperties and each requiring its own specific...
Publication: CIM Bulletin
Auteur(s): M.R. Babcock
Mots clés: Uranium, Rabbit Lake energy, Open pit mining, Mill operation, Mine operation.
Numéro: 932
Volume: 82
Année: 1989
Texte
Sommaire: The uranium deposits upon which the Rabbit Lake project story is based are located at the eastern margin of the Athabasca Basin just west of Wollaston Lake in northern Saskatchewan. This paper provides a general review of the exploration history for the major deposits and the influence of an expanding geological data base, which served to guide the continuing exploration programs.
A brief description of each of the deposits is provided in order of their discovery and with emphasis upon their...
Publication: CIM Bulletin
Auteur(s): D.M. Ward
Mots clés: Geology, Exploration, Rabbit Lake, Uranium.
Numéro: 932
Volume: 82
Année: 1989
Texte
Sommaire: Talc ore from Bakertalc, Highwater, Quebec analyzing about 60% talc, previously dry ground to about 95% minus 53 nm was beneficiated in an 11.4 kg/h pilot-plant flotation circuit. A concentrate of 95.9% talc (necessary for paper-grade) was obtained at a recovery at 75.3% by employing 53 g/t of Dowfroth 250 collector at pH 9.2; further cleaning increased the grade to 97.2% talc at a recovery of 57.5%.
Flotation of fresh ground 60% minus 44 pm ore at a feed rate of 18.6 kg/h produced a grade of...
Publication: CIM Bulletin
Auteur(s): P.R.A. Andrews
Mots clés: Talc ore, Grinding, Flotation, Multiple cleaning, Iron oxide reduction, Leaching, Pilot-plant, Retention times.
Numéro: 932
Volume: 82
Année: 1989