Cage hoist automation for today double-drum winder

Cette publication n'est pas offerte dans votre langue; certains de ses renseignements ont été préremplis pour la version française.
Mots clés : Equipment;Hoisting systems
Accés complet à Document technique
Version PDF pour 20,00 $
Recherche
Trier par :  Pertinence
Affichage des résultats 1 - 7
Texte
Publication: CIM Bulletin
Auteur(s): C.J. Kerr
Mots clés: Equipment, Hoisting, Braking systems
Numéro: 930
Volume: 82
Année: 1989
Texte
Publication: CIM Bulletin
Auteur(s): W. McKay, E. Laatio
Mots clés: Equipment, Tara Mines Ltd
Numéro: 930
Volume: 82
Année: 1989
Texte
Sommaire: On August 8, 1989, the Minister of Finance released a technical paper which sets out many of the details of a proposed 9% federal value-added tax to be called the "Goods and Services Tax". The GST, which is scheduled to be implemented with effect from January 1, 1991, will affect all Canadians in different ways and to varying degrees. The mining industry itself should, by and large, benefit from the new tax.
Publication: CIM Bulletin
Auteur(s): Robert B. Parsons
Numéro: 930
Volume: 82
Année: 1989
Texte
Sommaire: The application of failsafe techniques to ask the "What if" questions about any process has been well established in the chemical industry for many years. The unusual number of fatalities that occurred in Ontario during 1986-87, prompted Inco management to look at the Fail Safe techniques as a method of improving safety performance.
Publication: CIM Bulletin
Auteur(s): G.J. Stewart, M.R. Swaan
Mots clés: Safety, Failsafe techniques
Numéro: 930
Volume: 82
Année: 1989
Texte
Sommaire: Placer Dome Inc. is the operator of the Musselwhite project located 100 km north of Pickle Lake, Ontario. J.S. Redpath Limited was contracted to conduct an underground exploration program using shaft access.
During the winter of 1988, the shaft collar was established in 16 metres of water bearing sand and till overburden. This proper will illustrates the engineering techniques used to overcome the obstacles to installing a shaft collar in deep overburden. Specialized dewatering and piling...
Publication: CIM Bulletin
Auteur(s): Michael D. Winship, George S. Martin
Mots clés: Mining methods, Shaft collaring, Musselwhite project, Exploration, Underground mining, Engineering techniques
Numéro: 930
Volume: 82
Année: 1989
Texte
Sommaire: Estimating the mineral inventory and the mineable reserves in underground gold deposits is a difficult problem. This paper will consider a number of estimation techniques and recommend a method based on the geostatistical technique of indicator kriging.
A general discussion on the modelling of vein deposits is followed by a more detailed presentation of the geostatistical estimation method. For comparison, the mineral inventory for one vein of the Eastmain deposit in northern Quebec has been...
Publication: CIM Bulletin
Auteur(s): Clayton Deutsch
Mots clés: Eastmain, Ore reserves, Mineral inventory, Vein type deposits, Geostatistics, Indicator kriging, Gold deposits
Numéro: 930
Volume: 82
Année: 1989
Texte
Sommaire: In the base metals industry of today, operations required to continuously improve productivity and reduce unit production costs. Consistent with these goals is the improvement of the muck haulage cycle from open stapes with the No. 12 Mine.
Existing haulage from open slopes occurs with LHD units. Experience at Brunswick indicates that LHD units have a higher unit cost per tonne mucked than loader-truck combinations when the haulage exceeds approximately 150 m.
The reintroduction of open...
Publication: CIM Bulletin
Auteur(s): Stephen B. Flewelling, J. Jerome MacDonald
Mots clés: Equipment, Continuous loading systems, Technology, AL60 loader, Underground mining
Numéro: 930
Volume: 82
Année: 1989
Activé par Coveo Enterprise Search