San Antonio No. 3 Winze

NO. 3 winze, the sixth shaft to be sunk on the San Antonio property, is practically a duplicate of No. 3 shaft, which was the main shaft prior to the installation of the larger hoisting equipment in 1939. It is collared on the tenth, or 1,500-ft., level, and goes down vertically to the sixteenth, or 2,500-ft., level, with a loading pocket, spill pocket, and sump below this. It is 1,000 feet east of No. 3 shaft. All ore, men, and materials are handled through the latter.