Construction Work at Flin Flon

WHILE pilot-mill operations were being carried on at Flin Flon, as described by R. E. Phelan (1), a detailed topographic map was being made of the area in the vicinity of the ore-body for later use in laying out plans for the final plant. The area covered by this survey was 6,600 feet by 6,600 feet, with contours on 2-foot intervals.
Keywords: Concrete, Construction, Filter plant, Flin Flon-Island Falls, reverberatory furnace, zinc, Flin Flon, Materials, Operation, Plants, Power, power plant, Power plants, Railways
Full Access to Technical Paper
PDF version for $20.00