ITH drilling at 400psi at the Goldex Mine

CIM MEMO 2008
Patrick Frenette,
Abstract The Goldex Mine will start production in the first quarter of 2008. In order to achieve a production of 7000tpd, ITH drilling at 400 psi was selected. ITH drilling at this pressure will be one of the first underground application. This paper will discuss the anticipated gains and show some preliminary results.
Keywords: ITH drilling