Towards formalizing qualitative operations input into mine planning

CIM Journal, Vol. 2, No. 4, 2011
E. Lampard, T. G. Joseph
Abstract
Surface mining operations must manage variability from within their
operations as well as variability imposed upon them by external forces. A
framework to manage both internal and external variability through the
continuous review and adjustment of a mine plan during active mining lifetime
operation is introduced, to minimize lost production and maintain operational
safety. The observational approach of “observe, evaluate, interpret, predict,
and adapt” is employed as the backbone of this approach. Although written with a
surface mining operation in mind, the framework outlined in this paper would be
equally applicable to any mining or processing operation.
Keywords: Mine plan, Mine schedule, Variability, Safety, Lost production, Float days, Update, Adjustment, Operations, Maintenance"